01 — System Size
Panels, strings and BOS — sized from your plant capacity.
From kW to array count, min/max panels per string, inverter rating, DC cable, AC cable, earthing, and MCCB — all in one pass.
A precision toolkit for solar installers, electricians and PV designers. Three calculators — system sizing, string configuration, and AC cable selection — cross-checked against catalogue ampacities, voltage-drop limits, and MCCB rating standards.
From kW to array count, min/max panels per string, inverter rating, DC cable, AC cable, earthing, and MCCB — all in one pass.
Split a known panel count into strings that stay under the inverter's cold-day Voc ceiling, distributed as evenly as possible.
Scans standard aluminium sizes; picks the smallest that clears both the current requirement and your allowed voltage drop.
Switch between tools with a click, or use the ← → arrow keys.
| Min. Panels per String | – |
| Max. Panels per String | – |
| String Configuration | – |
| DC Wire | – |
| Phase / Cable Type | – |
| AC Wire (Aluminium) | – |
| Earthing Wire | – |
| MCCB | – |
| String Configuration | – |
| System Voltage | – |
| Full Load Current | – |
| Design Current (after derating) | – |
| Required Current (with safety margin) | – |
| Cable Type / Installation | – |
| Recommended Cable Size | – |
| Actual Ampacity | – |
| Actual Voltage Drop | – |
| Actual Voltage Drop (Volts) | – |